Fast formwork for a large hotel complex
PASCHAL has proven that even large construction sites can be easily completed on time and within budget by using optimis…
PASCHAL has proven that even large construction sites can be easily completed on time and within budget by using optimis…
In future, this pair of wind turbines at the Nortorf wind farm will generate 13.2 MW, replacing four old wind turbines. …
Hentschke Bau GmbH relies on the PASCHAL Maturix concrete monitoring system during the production of pre-fabricated comp…
The floating foundation is poured on land The reinforced concrete construction work was carried out on dry land in the…
The planned high-voltage power line will connect the grid nodes of Wahle in Lower Saxony and Mecklar in the Ludwigsau co…
SAGUAPAC is a non-profit cooperative for drinking water and basic sanitation. The construction of the EBAP NORTE pump st…
For the construction of the new West Fire Station in Lahr with high-quality exposed concrete surfaces, the lead contract…
After an extensive research and planning phase, the Raiffeisen Ostmünsterland eG construction site was set up in August…
With its NeoR formwork system, PASCHAL is offering a new lightweight formwork that combines the benefits of the proven M…
For the construction of the new mental health rehabilitation centre in Beroun, the construction company has opted for fo…